
Case Study
Ipsen, MPH Construction
Site Engineering throughout the construction of a major pharmaceutical project
The Project
Site Engineering & Setting Out
Project requirements
The primary objectives of the project were:
- Create
Methodology
- Planning and RAMS:
- Survey control: A ground based survey control network was established using GCP’s (ground control points) to ensure dimensional precision.
- Drone deployment:
- Data processing
Outcome
Project details
Client Ipsen / MPH Construction
Location Wrexham, North Wales
Duration 3 Years
Year 2023 - 2026
Services delivered
The Project
