Case Study
Ipsen, MPH Construction
Site Engineering throughout the construction of a major project
The Project
Site Engineering & Setting Out
Project requirements
The primary objectives of the project were:
- Provide and maintain all dimensional and level control for the site
- Check and monitor all subcontractors work for setting out accuracy and quality
- Ensure the building was constructed in accordance with the design and construction tolerances
- Raise RFI’s and TQ’s. Problem solving of technical site issues
- Record keeping – progress and quality control
- Liaising with the design team, providing surveys and as-builts
- Ensure the project ran smoothly from an engineering perspective
Project details
Client Ipsen / MPH Construction
Location Wrexham, North Wales
Duration 3 Years
Year 2023 - 2026
Services delivered
The Project